• The Aldiss camp is host to ~201koz in Reserves and is Silver Lake's third Mining Centre at Mount Monger
    • Dedicated haul road to the mill.  80 person camp and mobile equipment workshop.
    • Low pre-production capital works of A$7.3M.
    • Reserves 2.9mt @ 2.2 g/t for 201koz.
    • Resources 9.4mt @ 2.0 g/t for 593koz.
    • Owner operator conventional drill, blast, loand and haul open pit mining operation.
  • Three proximal open pits provide base case 200koz production over FY19-21 (Harry's Hill, French Kiss, Karonie South).
  • Spice, Tank, Atriedes remain largely untested and have potential to add Mineral Resources through exploration which will benefit from established infrastructure.
  • Broad high-grade gold lodes at Karonie interpreted to continue down plunge, highly encouraging for future underground potential.