MINERAL RESOURCE STATEMENT AS AT 30 JUNE 2023

The Company’s total Measured, Indicated and Inferred Mineral Resources at 30 June 2023 are 43.1 million tonnes at 4.5 grams per tonne of gold containing 6.2 million ounces of gold, including 2.4 million tonnes at 0.6 percent copper containing 14,400 tonnes of copper.  The Mineral Resources as at 30 June 2023 are estimated after allowing for depletion during FY2023

 

 

ORE RESERVE STATEMENT AS AT 30 JUNE 2023

The total Proved and Probable Ore Reserves at 30 June 2023 are 14.9 million tonnes at 3.0 g/t gold containing 1.44 million ounces of gold, including 1.6 million tonnes at 0.2 % Cu containing 2,800 tonnes of copper. The Ore Reserves at 30 June 2023 are estimated after allowing for depletion over FY2023.  Mount Monger Ore Reserves were estimated using a gold price of A$2,200/oz for Tank South, Santa Underground and Flora Dora, A$2,300/oz for Maxwells, A$2,400/oz for Daisy Complex and Cock-eyed Bob, A$2,600/oz for Santa Open Pit and A$2,800/oz for Rumbles. Sugar Zone Ore Reserves were estimated using C$2,300/oz. Deflector Ore Reserve NSR was estimated using A$2,400/oz gold price and A$11,900/t copper price.

 

 

 

 

Notes to Tables Mineral Resource and Ore Reserve tables:

1.    Mineral Resources are reported inclusive of Ore Reserves.

2.    Data is rounded to thousands of tonnes, thousands of ounces gold, and hundreds of tonnes copper. Discrepancies in totals may occur due to rounding.

3.    All Mineral Resource and Ore Reserve estimates are produced in accordance with the 2012 Edition of the Australian Code for Reporting of Mineral Resources and Ore Reserves (the 2012 JORC Code).

4.    The Table 1 Checklists of Assessment and Reporting Criteria relating to the updated 2012 JORC Code Mineral Resources and Ore Reserves estimates for significant projects that are reported for the first time or when those estimates have materially changed are contained in the Appendix to this announcement.

 

MINERAL RESOURCE AND ORE RESERVE GOVERNANCE AND INTERNAL CONTROLS

Silver Lake ensures that the Mineral Resource and Ore Reserve estimates quoted are subject to governance arrangements and internal controls activated at a site level and at the corporate level. Internal reviews of Mineral Resource and Ore Reserve estimation procedures and results are carried out through a technical review team which is comprised of highly competent and qualified professionals. These reviews have not identified any material issues. The Company has finalised its governance framework in relation to the Mineral Resource and Ore Reserve estimates in line with the conduct of its business. Silver Lake reports its Mineral Resources and Ore Reserves on an annual basis in accordance with the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code) 2012 Edition (except where stated). Mineral Resources are quoted inclusive of Ore Reserves. Competent Persons named by Silver Lake are Members or Fellows of the Australasian Institute of Mining and Metallurgy and/or the Australian Institute of Geoscientists and qualify as Competent Persons as defined in the JORC Code. The Mineral Resources and Ore Reserves statements are based upon, and fairly represent, information and supporting documentation prepared by the Competent Persons named below. The Mineral Resources statement as a whole, as presented in this Annual Report, has been approved by Antony Shepherd a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. The Ore Reserves statement as a whole, as presented in this Annual Report, has been approved by Sam Larritt a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy.

COMPETENT PERSON'S STATEMENT

The information in this Annual Report that relates to the Mineral Resources for the Harrys Hill, Santa, Cock-eyed Bob, Maxwells, Daisy Combined, Mirror/Magic, Tank/Atreides, Spice, Aspen, French Kiss, Italia/Argonaut, Lorna Doone, Rumbles, Costello, Randalls Dam and Karonie deposits is based upon information compiled by Aslam Awan, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Awan is a full-time employee of the Company. Mr Awan has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Awan consents to the inclusion in the Annual Report of matters based on his information in the form and context in which it appears. The information in this Annual Report that relates to the Mineral Resources for the Deflector deposit is based upon information compiled by David Buckley, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Buckley is a full-time employee of the Company. Mr Buckley has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Buckley consents to the inclusion in the Annual Report of matters based on his information in the form and context in which it appears. The information in this Annual Report that relates to the Mineral Resources for the Rothsay and Sugar Zone deposits is based upon information compiled by Kane Hutchinson, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Hutchinson is a full-time employee of the Company. Mr Hutchinson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hutchinson consents to the inclusion in the Annual Report of matters based on his information in the form and context in which it appears. The information in this Annual Report that relates to Ore Reserves for Deflector, Daisy, Maxwells, Cock-eyed Bob, Santa, Rumbles, Tank and French Kiss is based upon information compiled by Sam Larritt, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Larritt is a full-time employee of the Company. Mr Larritt has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Larritt consents to the inclusion in the Annual Report of matters based on his information in the form and context in which it appears. The information in this Annual Report that relates to Ore Reserves for Rothsay and Sugar Zone is based upon information compiled by Jigar Patel, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Patel is a full-time employee of the Company. Mr Patel has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Patel consents to the inclusion in the Annual Report of matters based on his information in the form and context in which it appears. All other information in this Annual Report relating to Mineral Resources is based on information compiled by Antony Shepherd, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Shepherd is employed by Silver Lake Resources. Mr Shepherd has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Shepherd consents to the inclusion in the Annual Report of matters based on his information in the form and context in which it appears.

FORWARD LOOKING STATEMENTS

This Annual Report may contain forward looking statements that are subject to risk factors associated with gold exploration, mining, and production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, Reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. Forward-looking statements, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and unknown risks, uncertainties and other factors, many of which are outside the control of Silver Lake. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward looking statements or other forecast.

Site by IBC Digital