MAXWELLS - UNDERGROUND

 

  • Maxwells is located 18km east of the Randalls Gold Processing Facility
  • Mining at the Maxwells open pit was completed in June 2014 delivering 945kt @ 2.7g/t Au for 81Koz (>1,000 ounces per vertical metre)
  • Development of the underground mine commenced in early FY2017 and has the potential to become a long life, low cost gold producer
  • Strong FY2016 drilling results resulted in a substantial 400% increase in Mineral Resource ounces
  • Multiple stacked and parallel lodes plunging to south
  • Potential repeat lode system down dip, east and west
  • 2017 JORC Resource of 1.9Mt @ 5.5g/t Au for 333Koz
  • 2017 JORC Reserve of 506kt @ 4.7g/t Au for 76koz