  • Cock-eyed Bob is located 13km east of the Randalls Gold Processing Facility
  • Five levels developed underground to approximately 130m below surface
  • Limited drilling below the 345 mining level
  • FY2016 drilling program successfully targeted Inferred Resource extension and upgrade below the 345 level with 18 holes drilled with 12 visible gold intersections
  • Development to the 330 level commenced Q1 FY2017
  • Additional 3 phases of exploration drilling commenced and will be completed in H1 FY2017 with the aim of defining mining blocks below the 330 level to generate a long-term mining plan
  • 2017 JORC Resource of 1.5Mt @ 5.8g/t Au for 274koz
  • 2017 JORC Reserve of 381kt @ 6.1g/t Au for 75koz